A lot has changed since the Keystone XL project was proposed in 2005. Ramped up domestic oil production and new supply routes have lessened the U.S.’s need for the hundreds of thousands of barrels of oil that would have been pumped daily through the now-cancelled pipeline, some industry experts say.